The winds of the Primorye

10 gay porn pics wind power installation each 2.3 MW in capacity shall be installed at the Primorye territory at Popova island. The management of the Far Eastern wind power plant at RusHydro are preparing to conclude an agreement for the supply of equipment. «The project is interesting. This is the first energy facility at the Primorye territory operating basing on renewable sources of energy, – said the representative of the press-service. – The resulting electric energy shall be delivered into the unified energy system of the Primorye territory. First of all it shall be used for the supply of island areas».

According priligy online to the speaker, the selected location for the electric power plant has the optimal wind force. However the company is also considering other parts of the Primorye territory in order to install the new type of units.

The lesbian xxx representatives of RusHydro told «FederalPress» buy generic diflucan online  that according to the research performed, installed capacity ratio amounts here to 34, meanwhile according to the global standards the level of 27-28 is already enough for the installation of wind power generators. «The Far Eastern wind power plant shall be constructed using modern technologies completely excluding any harmful environmental impact. For example, the rotation speed of the unit is 17 rpm which reduces the level of noise and vibration near to zero», – noted the representative of the Far Eastern power plant.

13.01.2011

www.fedpress.ru